Rule 88. Scheduling of Hearings

      The procedure for fixing the date, time and place of a hearing before a panel of arbitrators shall be prescribed by circuit rule provided that not less than 60 days’ notice in writing shall be given to the parties or their attorneys of record. The hearing shall be held on the scheduled date and within one year of the date of filing of the action, unless continued by the court upon good cause shown. The hearing shall be held at a location provided or authorized by the court or remotely, including by telephone or video conference.


Adopted May 20, 1987, effective June 1, 1987; amended Sept. 29, 2021, eff. Oct. 1, 2021.

Committee Comments

      Each circuit engaged in a mandatory arbitration program is best suited to determine the scheduling of hearings to accommodate its case-flow needs and the availability of arbitrator personnel.

      The Philadelphia program is eminently successful in achieving an efficient program-at the time it is filed, a case in the arbitration track is assigned a hearing date eight months from the date of filing. Philadelphia has a central facility styled “Arbitration Center,” in an office building in the city center, a short distance from most other court facilities. The eight-month period has proved to be sufficient to enable the parties to complete their discovery and preparation for hearing. Most matters scheduled for arbitration are settled prior to hearing.

      The time within which matters in arbitration should be heard is not intended to be a period of limitations but rather a reasonable expectation. Every jurisdiction studied, many with higher monetary limits for arbitrability, have reported that these cases can be heard within the period of one year without prejudice to the parties.

      Experience dictates that the use of courthouse facilities provides a desirable quasi-judicial atmosphere and a ready access to the court for timely rulings. A centralized operation of the program provides greater efficiency in the use of arbitrator’s and attorney’s time. A central facility also results in better monitoring of the progress of a case diverted to arbitration.


Last Modified on Rules.Legal: